Code example: Retrieve project status with cut lists from Tekla EPM

Updated: 5 Feb 2021

This guide explains the Tekla EPM Open API command GetProjectStatus and how you can use it to get, for example, CutList information.

Tekla EPM Open API command GetProjectStatus

GetProjectStatus retrieves summary information about the job including:

  • Assemblies
  • Drawings
  • Sequences
  • Lots
  • RFIs
  • Change Orders
  • Transmittals
  • Cut Lists
  • Material Status
  • Production Status
  • Shipping Status

GetProjectStatus command contains several fields that are not included in this guide.  For detailed documentation of all fields, see API Reference. XML is handy in that it lets you easily ignore unrecognized fields. So feel free to not define anything you don’t want.

 

The following example shows how to get CutList information. After retrieving the information, you can present the list of Cut Lists available for cutting in this job (cut list with something uncut). 

Retrieving CutList information for one job

Command Required Parameter Optional Parameter
GetProjectStatus    ProductionControlID:integer OR JobNumber:string    IncludeCutLists:boolean

 

IncludeCutLists should be included, so it it is set to 1.

Here command GetProjectStatus uses ProductionControlID parameter: 

<FabSuiteXMLRequest>
<GetProjectStatus>
  <ProductionControlID>1394</ProductionControlID>
  <IncludeCutLists>1</IncludeCutLists>
</GetProjectStatus>
</FabSuiteXMLRequest>

Or, you can call GetProjectStatus with JobNumber parameter:

<FabSuiteXMLRequest>
<GetProjectStatus>
  <JobNumber>7.3 Basic Training EA</JobNumber>
  <IncludeCutLists>1</IncludeCutLists>
</GetProjectStatus>
</FabSuiteXMLRequest>

Here is the example response:

<?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
<FabSuiteXMLResponse xmlns="http://www.fabsuite.com/xml/fabsuite-xml-response-v0105.xsd" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">

  <GetProjectStatus>
    <Successful>1</Successful>
    <ProductionControlID>1394</ProductionControlID>
    <JobNumber>7.3 Basic Training EA</JobNumber>
    <JobDescription>7.3 Basic Training EA</JobDescription>
    <JobLocation/>
    <GroupName/>
    <GroupName2/>
    <HasProjectSchedule>0</HasProjectSchedule>
    <InputDisplayUnits>
      <SizeUOM>Imperial</SizeUOM>
      <LengthUOM>Imperial</LengthUOM>
      <LengthTypeIDMetric>101</LengthTypeIDMetric>
      <LengthTypeIDImperial>1</LengthTypeIDImperial>
      <WeightUOM>Imperial</WeightUOM>
      <PriceUOM>Imperial</PriceUOM>
    </InputDisplayUnits>
    <Assemblies>
      <Quantity>106</Quantity>
    </Assemblies>
    <Drawings>
      <Total>118</Total>
      <TotalApproved>0</TotalApproved>
    </Drawings>
    <Sequences>
      <Total>4</Total>
    </Sequences>
    <Lots>
      <Total>2</Total>
    </Lots>
    <CutLists>
      <CutLists>3</CutLists>
      <CuttingDetails>4</CuttingDetails>
      <TotalCut>0</TotalCut>
      <TotalInvalidated>0</TotalInvalidated>
      <TotalValidationRequired>0</TotalValidationRequired>
      <TotalOnOrder>0</TotalOnOrder>
      <CutList>
        <CutListID>398</CutListID>
        <CutListName>W10x12</CutListName>
        <DateCreated>2015-04-29</DateCreated>
        <DateRequired>2015-04-30</DateRequired>
        <CuttingDetails>2</CuttingDetails>
        <TotalCut>0</TotalCut>
        <TotalInvalidated>0</TotalInvalidated>
        <TotalValidationRequired>0</TotalValidationRequired>
        <TotalOnOrder>0</TotalOnOrder>
      </CutList>
      <CutList>
        <CutListID>399</CutListID>
        <CutListName>W12x22</CutListName>
        <DateCreated>2015-04-29</DateCreated>
        <DateRequired>2015-04-30</DateRequired>
        <CuttingDetails>1</CuttingDetails>
        <TotalCut>0</TotalCut>
        <TotalInvalidated>0</TotalInvalidated>
        <TotalValidationRequired>0</TotalValidationRequired>
        <TotalOnOrder>0</TotalOnOrder>
      </CutList>
      <CutList>
        <CutListID>400</CutListID>
        <CutListName>W14x30</CutListName>
        <DateCreated>2015-04-29</DateCreated>
        <DateRequired>2015-04-30</DateRequired>
        <CuttingDetails>1</CuttingDetails>
        <TotalCut>0</TotalCut>
        <TotalInvalidated>0</TotalInvalidated>
        <TotalValidationRequired>0</TotalValidationRequired>
        <TotalOnOrder>0</TotalOnOrder>
      </CutList>
    </CutLists>
  </GetProjectStatus>

</FabSuiteXMLResponse>