fsresChangeOrderDetails_ChangeOrder Class |
The details for one ChangeOrder.
Namespace: FabSuiteResponseApi
Assembly: FabSuiteResponseApi (in FabSuiteResponseApi.dll) Version: 1.0.0.0 (1.0.0.0)
C#
[SerializableAttribute] [XmlTypeAttribute(Namespace = "http://www.fabsuite.com/xml/fabsuite-xml-response-v0108.xsd")] public class fsresChangeOrderDetails_ChangeOrder
The fsresChangeOrderDetails_ChangeOrder type exposes the following members.
| Name | Description | |
|---|---|---|
| fsresChangeOrderDetails_ChangeOrder |
fsresChangeOrderDetails_ChangeOrder class constructor
|
Top